Technical Reports

TR

Description

Responsible

Contract Date

Current Date

TR1

Comparative study of spatial data aggregation techniques

CTU

December 1999

Finished

TR2

Metadata language specification

VUT

May 1999

Finished

TR3

Analysis of OLAP modifications

VUT

December 1999

Finished

TR4

Integration module specification

CTU

December 1999

Finished

TR5

Integration module documentation

CTU

July 2001

Finished

TR6

Data security concepts

UE

December 1999

Finished

TR7

Security layer specification

UE

September 2000

Finished

TR8

Application A1 specification

VEGA

March 1999

Finished

TR9

Application A1 documentation

CERT

May 2001

Finished

TR10

Security evaluation report

UE

January 2001

Finished

TR11

Application A2 specification

LUM

March 1999

Finished

TR12

Application A2 documentation

LUM

May 2001

Finished

TR13

Specification of background spatial knowledge representation

CTU

July 2000

Finished

TR14

Simulation module specification and documentation

VUT

November 2000

Finished

TR15

KDD package design

TUK

September 1999

Finished

TR16

KDD package evaluation

TUK

August 2001

Finished

TR17

Tutorial of Sumatra Embedding

CTU

Not required

Finished

TR18

Description of Integration Module Prototype

CTU

Not required

Finished

TR19

Prototype Applications

CERTICON

Not required

Finished

Software Prototypes

TR

Description

Responsible

Contract Date

Current Date

SP1

Prototype of modified OLAP (ver 1)

TUV

September 2000

Finished

SP2

Prototype of integration module

CTU

September 2000

Finished

SP3

Prototype of modified OLAP (ver 2)

TUV

July 2001

Finished

SP4

Prototype of application A1

CERT

October 2000

Finished

SP5

Prototype of application A2

LUM

October 2000

Finished

SP6

Prototype of simulation module

VEGA

May 2001

Finished

SP7

KDD techniques package

TUK

January 2001

Finished

Periodical Reports

Id

Description

Responsible

Contract Date

Current Date

PR1

Progress Report - 1st year

CTU

September 1999

Finished

PR2

Progress Report - 2nd year

CTU

September 2000

Finished

PR3

Progress Report - 3rd year

CTU

September 2001

Finished

Management Reports and Cost Statements

CTU - the co-ordinator of WP7 - Management assembled both management reports and cost statements.

Management reports reporting the 6 months long periods were provided by each partner to CTU within the month following the reported period. Contributions from particular partners were processed by CTU into Project Management Report. After approval by the Project Co-ordinator the Project Management Report was delivered to the Programme Directorate not later than two months after reported period.

The same reporting period (6 months) and organisation were used for reporting the cost statements.

Reviews

Reviews were organized regularly one month after the date of each milestone